Sverzac Bridge Replacement

  • Client Name: Argo Road Maintenance
  • Project Name: Sverzac Bridge Replacement
  • Location: Dawson Creek, BC
  • Sector: Forestry
  • Timeline Start: August 16, 2021
  • Timeline End: August 2, 2021

Formula was hired to replace the Sverzac Bridge near Dawson Creek, BC. The scope of work for this bridge included:

  • Removal of existing debris in and around existing bridge
  • Removal of existing bridge including timber sub-structure
  • Supply and installation of lock block foundations c/w timber sills, lock block return walls and timber ballast boards
  • Supply and installation of (1) 60’ L100 oil field portable with timber deck mods (21’ travelled width)
  • Supply and installation of 200 cu.m of 50kg rip rap with geotextile fabric
  • Supply and Installation of 400 cu.m of 1” crush as bridge end fill