Gordon Creek Bridges
Formula was engaged in the construction of three (3) L100 Bridges including foundation, footings, columns, bracing, backwall, caps and bearings. A full structural deck, bridge rails, all approaches and retaining wall were completed. This bridge was constructed to accommodate the owner’s equipment loads.