Gordon Creek Bridges

  • Client Name: Peace River Coal
  • Project Name: Gordon Creek Bridges
  • Location: Tumbler Ridge, BC
  • Sector: Mining
  • Timeline Start: December 31, 2010
  • Timeline End: December 31, 2010

Formula was engaged in the construction of three (3) L100 Bridges including foundation, footings, columns, bracing, backwall, caps and bearings.  A full structural deck, bridge rails, all approaches and retaining wall were completed.  This bridge was constructed to accommodate the owner’s equipment loads.