Enbridge Aerial Pipe Bridges

  • Client Name: Enbridge
  • Project Name: Enbridge Aerial Pipe Bridges
  • Location: Mt. Lemoray and Coquihalla, BC
  • Sector: Oil & Gas
  • Timeline Start: December 31, 2016
  • Timeline End: December 31, 2016

COQUIHALLA #6

Formula Contractors was awarded the contract to construct this 72.0m long aerial pipe bridge.  Aerial Pipe Bridge #6 crosses the Coquihalla River near Hope, BC.  Formula constructed the pile and cast in place concrete foundation, erected the truss segments, and installed the 36″ gas line.  This project was completed on time and on schedule.

SITE U2112

Formula Contractors was awarded the contract to construct this 187.0m long aerial pipe bridge.  Site U2112 crosses the Pine River near Mt Lemoray, BC.  Formula supplied and installed the required pile foundation, designed, and constructed the pier system and erected the supplied truss segments.  Also required was to supply, maintain a 48.0m detour bridge across the Pine River to allow for construction access to the east bank.  This project was completed on time and on schedule.