Giekie Bridge Replacement

  • Client Name: BC Ministry of Transportation and Infrastructure
  • Project Name: Giekie Bridge Replacement
  • Location: Haida Gwaii, BC
  • Sector: Highways
  • Timeline Start: December 31, 2018
  • Timeline End: December 31, 2018

Major components of the work included:

  • traffic management / control
  • detour design and construction
  • pile driving
  • installation of precast sub-structure
  • cast in place deck
  • waterproof membrane installation
  • instream channel improvements
  • approach fills
  • clearing / grubbing
  • grading and paving