Galore Creek Bridges
Formula constructed numerous bridges for the Galore Creek Mining Corporation in the 2000’s.
Lower More River Bridge (2008)- Launching and installation of a 300′ bridge over the Lower More River to provide access for a mining project.
Iskut River Bridge- 119-meter span across the Iskut River. Steel girder, non-composite deck. Rated at 165-ton loading for mining traffic. Constructed over a two-month period.
Muskwie River Bridge- 98-meter span across the Muskwie River. All components and equipment were disassembled into weights that could be flown by heavy lift helicopter.