Redwillow River Bridge
The scope of work at this site included:
- Mobilization
- Environmental compliance measures
- Erosion control measures
- Traffic accommodation
- Removal of the existing bridge structure
- Head slope preparation and backfill
- Excavation and Backfill
- Pile installation
- Construction of concrete piers and abutments
- Supply, delivery, and installation of bearings
- Supply, delivery, and erection of steel girders and associated materials
- Miscellaneous iron
- Construction of concrete deck, barriers, and approach slabs
- Bridge-rail and guardrail installation
- Placement of deck waterproofing and ACP wearing surface
- Construction of drain troughs
- Heavy rock riprap (Class 2 & 3)
- Roadway work (grading, basecourse and ACP)