Prohibition Creek Bridge

  • Client Name: Government of the Northwest Territories
  • Project Name: Prohibition Creek Bridge
  • Location: Mackenzie Valley, NWT
  • Sector: Highways
  • Timeline Start: December 31, 2011
  • Timeline End: December 31, 2011

Design build of a 108 m steel girder and concrete deck bridge founded on a drilled pile foundation. Located at KM 995.3 on the Mackenzie Valley Winter Road near Norman Wells NWT.

Throughout the project crews dealt with northern winter conditions and isolated logistics. Due to Formula’s knowledge of logistics and ice roads we were able to save the client $700,000 post tender.