Formula has significant experience in the design and installation of the complicated infrastructure of energy substations.

We work with our utility and industrial clients to develop the safe, reliable facilities and support mechanisms necessary to provide consistent power. At Formula, we encourage the expansion of passive renewable energy sources, such as run-of-river hydro, in an effort to drive sustainability and minimize our environmental footprint.

BRULE 69kv AND 230kv SUBSTATIONS
Completed: 2011
Owner: Walter Energy

This was a $1,200,000 project in Chetwynd, BC.

OYSTER RIVER SUBSTATION
Completed: 2008
Owner: BC Transmission Corporation

This was a $400,000 project near Oyster River, BC.

MURRIN #2 SUBSTATION UPGRADES
Completed: 2008
Owner: BC Transmission Corporation

This was a $1,000,000 project near Vancouver, BC.

SAVONA SUBSTATION EXPANSION
Completed: 2006-07
Owner: BC Transmission Corporation

This was a $300,000 project near Savona, BC.

DUNSMUIR SUBSTATION
Completed: 2004
Owner: BC Transmission Corporation

This was a project near Qualicum, BC.