Formula has decades of experience with site-specific girder installations.

From simple to complex, we engineer our girder projects to absolute perfection. We can erect them with cranes or launch them on rollers and tension-cable skylines. We can construct temporary shoring towers or cantilever the beams. Formula brings our proven expertise and the right equipment to do the job in the safest, most efficient manner.

UBC OKANAGAN FLYOVER GIRDER ERECTION
Completed: 2007
Owner: Coquitlam Ridge Construction

This was a $250,000 project in Kelowna, BC.

HIGHWAY OVERPASS GIRDER CONSTRUCTION
Owner: Alberta Infrastructure

Erection of beams for new highway overpass over CP rail line in Calgary, Alberta.

STEEL GIRDER OFF-LOADING
Owner: Flat Iron Construction

Responsible for off-loading 12 foot high steel girders from rail cars in the vertical position and rotating to the horizontal position and loading onto special trailers. The steel beams could not be shipped vertically due to their height once loaded onto trailers, the beams were then transported to Kicking Horse Pass bridge site.

NATION RIVER I-GIRDER INSTALLATION
Owner: Ministry of Transportation

Winter installation of 33 metre long pre-cast concrete I-girders over the Nation River north of Fort St. James, BC.

FALSEWORK
Owner: Skeena Cellulose

Falsework using post tensioned cables, 100 KIP shoring and 22 hillman rollers for launching 300 tons of structural steel.

STEEL TRAPEZOIDAL GIRDER ERECTION
Owner: Government of British Columbia

Erection of steel trapezoidal girders over the new Vancouver Island Highway.