Formula Contractors Ltd. has successfully completed installing girders up to 220m.

From crane erected structures to technical girder launching using rollers, cantilevering, skylines and temporary shoring towers, our projects are engineered for each site based on its specific requirements and available equipment.

HIGHWAY OVERPASS GIRDER CONSTRUCTION
Owner: Alberta Infrastructure

Erection of beams for new highway overpass over CP rail line in Calgary, Alberta.

STEEL GIRDER OFF-LOADING
Owner: Flat Iron Construction

Responsible for off-loading 12 foot high steel girders from rail cars in the vertical position and rotating to the horizontal position and loading onto special trailers. The steel beams could not be shipped vertically due to their height once loaded onto trailers, the beams were then transported to Kicking Horse Pass bridge site.

NATION RIVER I-GIRDER INSTALLATION
Owner: Ministry of Transportation

Winter installation of 33 metre long pre-cast concrete I-girders over the Nation River north of Fort St. James, BC.

FALSEWORK
Owner: Skeena Cellulose

Falsework using post tensioned cables, 100 KIP shoring and 22 hillman rollers for launching 300 tons of structural steel.

STEEL TRAPEZOIDAL GIRDER ERECTION
Owner: Government of British Columbia

Erection of steel trapezoidal girders over the new Vancouver Island Highway.