Formula Contractors Ltd. owns and operates a fleet of pile driving equipment that is capable of installing most pile configurations in a variety of applications. Formula also provides foundation drilling services with a Soilmec SR-30 Drill which is capable of drilling for cast in place concrete piles, cased bored piles, continuous flight augured piles, pile pre-drilling and pile clean out.

Truck mounted and track mounted cranes are available with drop, diesel, air, churn and vibro hammer configurations. Formula is able to provide pile driving and drilling services for bridge structures, foundations, mill construction, oil field construction, retaining structures and marine dredging and construction. Formula can install steel pipe piling, timber piles, H-type piles and sheet piles. We employ certified crane operators and ticketed trades people and are available for projects throughout western Canada.

BLIND CORNER
Completed: April 2017
Owner: Peace River Hydro Partners

This project included the supply and installation of 110 locations of 460 mm diameter drilled piles that were socketed into a shale formation to help prevent a slope stability issue at the Site C Hydro Electric project near Ft. St John BC.  Formula completed this task by utilizing it’s Soilmec SR-30 Drill to auger and advance each pile thru 10.0m of unstable overburden and then drill and advance each pile by 2.0m into a competent layer of shale.

PADDLE RIVER BRIDGE
Completed: May 2016
Owner: CN Rail

This emergency Pile Driving / Bridge Construction Project was located at Mayerthorpe Alberta.  The existing 800′ timber trestle was destroyed in a fire.  Within 24 hours, Formula mobilized to the project site and completed the required H-Pile foundation, installed all the required pier bracing, precast bridge caps and precast tub beam installation for CN Rail – Sangudo Sub Line.  These works were completed within 13 days.

CANYON CREEK SHEET PILE RETAINING WALL
Completed: October 2015
Owner: Shell Canada Energy

Project located near Bragg Creek Alberta.  Formula was hired to design, construct and certify a Sheet Pile Retaining Wall that was required to protect infrastructure from an erosion event.

KAYBOB WATER SYSTEM – RIVER WATER INTAKE
Completed: April 2015
Owner: EnCana Corporation

Project located near Fox Creek Alberta.  Formula constructed a Sheet Pile Coffer Dam and constructed a Sheet Pile Water Intake Cell including construction of a Pump Intake, Grizzly Screen and associated structural steel work.

WIDC BUILDING SHORING
Completed: June 2013
Owner: PCL Westcoast and
IDL Projects Ltd.

Formula designed and installed the required foundation shoring for the new WIDC Building downtown Prince George BC.

LIARD RIG CELLARS
Completed: November 2013
Owner: Apache Canada Corp.

Formula assisted with the design and fully constructed a sheet pile shoring system for Apache Canada Corp. for the Liard BC drilling program. The cell consisted of a Sheet Pile Driven cell reinforced with waler system and a cast in place reinforced floor.

RTA MODERNIZATION PROJECT
Completed: October 2011
Owner: IDL Projects Ltd.

The Rio Tinto Alcan Modernization Project located at Kitimat, BC. Formula was hired to design, supply and install a sheet pile shoring system for the required underground services upgrade.

TUPPER WEST GAS PLANT
Completed: June 2010
Owner: Murphy Oil Corp.

Construction of new tank farm and elevated control building and office foundations. The job included over 200 drilled pile caissons.

NORTHWEST COMMUNITY COLLEGE
Completed: November 2009
Owner: Northwest Community College

Supply and installation of foundation piling for Northwest Community College expansion. Piles were driven using drop and diesel hammer configurations. Each location was then augured and cleaned. Reinforcing steel cages were installed then filled with concrete.

OKANAGAN LAKE, BC

Three piece sectional barge used for marine pile driving and construction.

BARRIERE RIVER, BC

Sheet pile wall installed with a vibro hammer used to isolate excavated area in river.

HINTON, ALBERTA

Installing foundation piling for a mill upgrade.

LOWER MORE RIVER, BC

Installing temporary bridge crossing with an excavator-mounted pile driver.

SINCLAIR MILLS, BC

Installation of steel H-piles under an existing active rail line.

LOWER MORE RIVER, BC

Temporary piling being removed with a vibro hammer.

INUVIK, NORTHWEST TERRITORIES

Installing bridge foundation piles with an 80 tonne crane and diesel hammer.