Formula Contractors Ltd. can provide concrete foundation construction from excavation, layout, forming, concrete batching and placing, rebar placement and concrete finishing.

TRANSCANADA PIPELINE SPARWOOD, BC
Completed: August 2013
Owner: League Pipeline

Formula furnished crew and materials to construct Valve Assembly foundations for the TransCanada Pipeline at Sparwood BC.

Di CORP TRANS LOAD FRAC SAND FACILITY
Completed: September 2013
Owner: USA Tank

Formula furnished crew and materials to construct the Rail Pit foundation, Scale Cap Beam Foundations along with Dead Men foundations at the Trans Load Frac Sand Facility at Grand Prairie Alberta.

TUPPER WEST GAS PLANT
Completed: June 2010
Owner: Murphy Oil Corp.

Located in Dawson Creek, BC. Construction of new tank farm and elevated control building and office foundations.

‘ALTA GAS’ BEAR MOUNTAIN WIND FARM
Completed: October 2008
Owner: Bear Mountain Wind Energy

Located near Dawson Creek, BC. Construction of the first ever Wind Farm/Tower foundations poured in BC. This included 13,000 m3 of on-site batched and placed concrete and 1.25 million kg of reinforcing steel.

With Enercon Machines in service, this is the first ever wind energy project in the Province of British Columbia to be generating power for the BC Hydro Grid for public consumption. These turbines (which are founded on Formula foundations) feed an on-site substation (that Formula did the civil works for) in order to provide power to 35,000 BC homes. We are proud of this project and for having the opportunity to be a part of this significant build.