 |
|
Home |
Services |
Our Company |
Our Clientele |
Employment |
Contact Us |
|
|
You are here: Home >> Services >> Highway Bridges
Highway Bridges
Girder Handling: Responsible for off loading 12 foot high steel girders from Rail Cars in the vertical position and rotating to the horizontal position and loading onto special trailers. The steel beams could not be shipped vertically due to their height once loaded onto trailers, the beams were then transported to Kicking Horse Pass bridge site.
Owner: Flat Iron Construction
|
 |
| The Johnson Street Bridge in Victoria, BC is a publicly used multi lane concrete and steel bridge originally constructed in 1921. This structure is part of the Vancouver Island Highways system and is subject to very high traffic and is within sight of the Provincial Parliament buildings. Formula's job was to upgrade the structural steel including the Bascule (raising) span and completely remove and replace the concrete decks while ensuring traffic flow for pedestrians, vehicles, Marine and Rail traffic.
|
 |
| Nechako River Bridge north of Vanderhoof, BC. This highway bridge is constructed with weathering steel girders and poured in place concrete. Total reconstruction of 3 spans plus addition of 1 span to 228 metres total length.
|
 |
Nation River Bridge located north of Fort St. James, BC. 3 span, 2 lane replacement bridge constructed of concrete.
Owner: Ministry of Transportation |
 |
Cochrane Road Overpass on Vancouver Island, BC. This bridge crosses over the new 4 lane freeway with a low profile 56 metre span.
Owner: Government of British Columbia.
|
 |
Please contact Formula Contractors today for more information. |
|
| |