Formula Pile and Bridge Contractors Ltd.

Culverts and Drainage

Formula Contractors specializes in the rapid installation of project specific culverts and drainage structures with minimum impact upon the surrounding environment.

Please contact Formula Contractors today for more information.

Assembling 24 metre span open bottom culvert
Assembling 24 metre span open bottom culvert for Cheviot Mine Access in Alberta. This structure required 50,000 cubic metres of highly compacted manufactured end fill to ensure culverts structural integrity.

Open bottom culvert underpass for recreational access
Open bottom culvert underpass for recreational access underneath three lane mine haul road.


Open bottom culvert
Open bottom culvert with concrete end walls and wings for fill retention.

Eliptical culvert
Elliptical culvert under resource haul road with well armored inlet to minimize erosion possibilities.


Pre cast concrete culvert backfilled
Pre cast concrete culvert backfilled with native material on resource road system.

Installation of a Precast Open Bottom Culvert
Installation of a Precast Open Bottom Culvert. The unit arrives in pieces and is assembled at site. They are quick to install and have a minimal effect on the existing stream.